• Ryno
  • Call Us
  • Email Us
Ryno
  • Home
  • Systems
  • Components
  • IGNO
  • About Us
  • Case Studies
  • Specifier Hub
  • News
  • Contact
  • Email
  • 0203 9673500
Ryno Pave
Smart paving systems for terraces, balconies, and outdoor spaces.
Learn More
Ryno Deck
Smart decking systems for terraces, balconies, and outdoor spaces.
Learn More
Ryno Roof
High quality, durable roof finishing systems for flat and pitched roof applications.
Learn More
Our Products

Ryno Support

Fast, easy and durable support systems for paving and decking.

Learn More

Ryno Terrace

Complete surface solutions for terraces, balconies and podiums.

Learn More

Ryno Roofing

High quality, durable roofing finishing systems for flat and pitch roof applications.

Learn More

Specifier Hub

Resources

Technical datasheets
CAD drawings
Specifications
Certificates
Install and maintenance

Learn More

Insights

Sustainability
Delivery
Approved installers
Warranty

Learn More

Book CPD

Learn More

Request Samples

Learn More

Technical Support

FAQs
Book a consultation
Contact us

Learn More

SUPPORT

Case Study: 22 Bishopsgate

  • LocationCity of London
  • Completed2021
  • ClientPrater

Sat in the heart of the City of London's financial district, 22 Bishopsgate has been called a 'vertical village' owing to the amount of space available across its 62 storeys, which includes the highest indoor climbing wall and largest cycle park in the country, as well as a wellbeing retreat space and private club.

With podiums stretching out from the structure periodically and large terraces atop, an incredibly strong and durable substructure solution was required.

Case Study: 22 Bishopsgate

System Used

RPF Fixed-head adjustable paving pedestals were used throughout the scheme. With a 22-550mm height range, and each pedestal capable of supporting loads in excess of 1000kg, the RPF is a very simple but effective product that ensures the total stability of the paved area.

Ryno Finish Strong
Ryno Finish Strong
Incredible city views are available from the uppermost levels

Incredible city views are available from the uppermost levels

Ryno Finish Strong
Ryno Finish Strong
Ryno Finish Strong
Case Study: 22 Bishopsgate

62 Storeys 

Sitting at such a height, the outermost slabs were ballasted down to prevent wind uplift. 

The RPF pedestal head features spacer tabs which create an equal distance between each slab. In this instance, a 10mm tab was selected to further prevent wind uplift by allowing increased airflow.  

Learn more about 22 Bishopsgate and hear what Construction Manager at Prater had to say about the project in the video below:

Ryno Finish Strong
A 'BMS' (Building Management System) ensures maintenance can occur with minimal disruption

A 'BMS' (Building Management System) ensures maintenance can occur with minimal disruption

Ryno Finish Strong
Ryno Finish Strong

Posted By
Bethany Gordon

Share

  • Share on Twitter
  • Share on Facebook
  • Share on LinkedIn
  • Share by Email
Support

Case Study: The Kia Oval International Cricket Ground >

20th July 2021
Terrace

Case Study: Avant-garde Court >

22nd June 2021
Support

Case Study: 22 Bishopsgate >

14th April 2021
Ryno Finish Strong
  • Home
  • About Us
  • News
  • Contact
  • IGNO
  • Specifier Hub
  • Case Studies
  • Components
  • RYNOPAVE
  • RYNODECK
  • RYNOROOF

Sign up for Ryno Updates and offers

*Required details. Submit
Ryno
  • Home
  • About Us
  • News
  • Contact
  • IGNO
  • Specifier Hub
  • Case Studies
  • Components
  • RYNOPAVE
  • RYNODECK
  • RYNOROOF
  • ©2022 Ryno Ltd, All rights reserved.
  • Terms & Conditions
  • Privacy Policy
  • Ryno on Twitter
  • Ryno on LinkedIn
  • Ryno on YouTube
  • Home
  • Systems
    • Ryno Pave
    • Ryno Deck
    • Ryno Roof
  • Components
  • IGNO
  • About Us
  • Case Studies
  • Specifier Hub
    • Resources
    • Insights
    • Book CPD
    • Request Samples
    • Technical Support
  • News
  • Contact
  • Email
  • 02039673500